Experience in National Highway, State Highway & Different type of Road Projects

Sl. No. Project Client Status
1 Preparation of Detailed Project Report (DPR) and Conducting Detail Survey & Investigation works for construction of Internal Bye-pass Road linking from 1st Gate to Jagannathpur & Alakapur-Ratnapur Link Road (ARLR) Barhmapur Development Authority, Barhampur, Odisha On going
2 Consultancy Services for Preparation of Detailed Project Report for Construction of Flyover Bridge (at R.D. 220.00 M to R.D.1740.00M) from Church Chhaka to Municipality Chhaka at on Sambalpur Town road. Executive Engineer Sambalpur (R&B) Division, Odisha. completed
3 Consultancy Services for feasibility study and detailed project preparation for Construction of 4-Lane dedicated Coal Corridor road from Bankibahal (Coal Mines) to Bhedabahal (SH-10) for Topographical Survey and detailed design of the alignment from 0/0Km to 16/0Km for the year 2013-14 Executive Engineer Sundargarh (R&B) Division, Sundargarh, Odisha completed
Sl. No. Project Client Status
4 Widening and strengthening of papadahandi- Umerhote-Yerla Road from 7/100 to 18/00 km, 50/700 to 54/550 km and 63/220 to 67/070 km on EPC mode. Offer letter for preparation of detailed drawing and design. Ratna Infrastructure Project Pvt. Ltd. Plot No. 88, Prashashan Nagar, Road No. 72, Jubilee Hills, Hyderabad-500 033. On going
5 Survey, Investigation & Preparation of Detailed Project Report for Improvement to Sohela-Nuapara road (Padampur to Paikmal) SH-3 from 56/0 Km to 82/0 Km under A.C.A. for 2007-08 in Baragarh District. Office of the Executive Engineer, Baragarh (R&B), Bargarh Completed
6 Widening and Strengthening of Existing Sambalpur-Sonepur Road from Maneswar at Km 0/000 to Kutapali at Km 34/890 of (S.H.-15) for the Stretch Km 25/000 Km to 27/500 Km. Executive Engineer, Sambalpur (R&B) Division, Sambalpur. completed
Sl. No. Project Client Status
7 Preparation of Detailed Project Report (DPR) and conducting Survey & Investigation works for construction of Ring Road Berhampur city. Executive Engineer Ganjam (R&B) Division No. II, Berhampur Completed
8 Survey, Investigation & Preparation of Detailed Project Report for the project Improvement to existing Sindurpank-Samasingha Road (MDR-19) to 2 Lane Standard from Km0/000 to Km40/170 under LWE Scheme. Executive Engineer Sambalpur (R&B) Division, Sambalpur Completed
9 Survey & Prepare a Detailed Project Report for the Improvement of the road from Koira to Barsuan Railway Siding to handle heavy axle load commercial traffic Jindal Steel & Power Limited., Nageswar Tangi, Bhubaneswar Completed
Sl. No. Project Client Status
10 Widening & Strengthening of Karanjia- Thakurmunda-Satakosia-Anandapur road (SH-53) from 10/0 to 30/0 Km (Part-A), from 42/000 to 64/980 Km (Part-B) in Mayurbhanja District and Bhadrak- Anandapur-Karanjia road (SH-53) from 43/350 to 57/680 Km (Part-C) in Keonjhar District. Sri Durga Condev (P) Ltd. Kairapari, Cuttack- 754022 On going
11 Fixing of Control points/Benchmarks & Topographical / Detail Survey & Taking Cross-Section for Design of Proposed 4-Lanning Contract for NH-59 Total 156 Km in the State of Madhya Pradesh. Sheladia Associates, Inc., Secunderabad. Completed
12 Fixing of Control points/Benchmarks & Topographical / Detail Survey & Taking Cross-Section for Design of Proposed 8 Lanning NH-8A from Shyamakhyali to Gandhidham (Gujrat) from Km. 306 + 000 to Km 366+000 under Sheladia Associates Inc. -do- Completed
Sl. No. Project Client Status
13 Field survey, preparation of drawings and calculation of quantities of each item for 4/6-laning and strengthening of existing 2-lane road stretches of 56km. NH-5, OR-III at Bhadrak to Blasore in the state of Orissa under the client - NHAI. Elsamex-TWS-SNC Joint Venture, Bhubaneswar. Completed
14 Preparation of Detailed Project Report for free left turning traffic track in all the traffic intersections of Capital City and its development. a) CRP Square b)Delta Square c)Fire Station Square d)Kalinga Hospital Square e)Patia Square f)KIIT Square g)Khandagiri Square Executive Engineer R&B Division No III, Bhubaneswar, Govt. of Odisha. Completed
15 Preparation of Comprehensive Plan for free left turning traffic track in all Square intersection in New Capital, Bhubaneswar for the year 2013-14. a) Rupali Square b) Ram Mandir Square c) IDBI Square d) Laxmisagar Square e) Satyanagar Square f) Sriya Talkies Executive Engineer R&B Division No I, Bhubaneswar, Govt. of Odisha. Completed

Experience in (PMC) Project Management Consultancy Work

Sl. No. Project Client Status
1 Architectural, Structural Design & Project Management Consultancy (PMC) for the construction of Management Institute of Birla Institute of Management & Technology (BIMTECH) at Gothapatna, Malipada, Bhubaneswar. Birla Institute of Management & Technology (BIMTECH) at Gothapatna, Malipada, Bhubaneswar Completed
2 Structural Design & Project Management Consultancy (PMC) for the construction of Learning Centre at SOS Children's village Bhubaneswar, Odisha SOS Children's Village of India, Plot No. 4, Block C-1, Nelson Mandela Marg, New Delhi. completed
3 Project Management Consultancy for Construction of Boundary Wall and ground level survey for sand filling at IOOHC, Bhubaneswar. Indian Oil Officers Housing Co-operative Limited, 1295, Forest Park, Bhubaneswar completed
Sl. No. Project Client Status
4 Providing Consulting service of J.E. (Civil) for day-to-day supervision of OUAT different site Project. OUAT, Bhubaneswar, Odisha. On going
5 Structural Design & Project Management Consultancy (PMC) for the construction of Abhiram Residency, Plot No-267, Saheed Nagar, Bhubaneswar. Abhiram Residency, Plot No-267, Saheed Nagar, Bhubaneswar Completed
6 Structural Design & Project Management Consultancy (PMC) for the construction of Shree Kutira at Chandrashekharpur, Unit No-A1, Phase II, Sector-5, Bhubaneswar. Shree Kutira of Shreedhar Sahu Over plot No. 321 (P) Sub Plot-S/5/24, Chandrashekharpur, Unit No-A1, Phase II, Sector-5, Bhubaneswar. completed

Experience in Railway Projects

Sl. No. Project Client Status
1 Conducting preliminary Cum Final survey work at M/s. Orissa Sponge Iron Ltd. situated at Palaspanga, Keonjhor District, Orissa. The work consists of survey of factory site for designing the yard inside the factory premises to accommodate loading & unloading lines and survey of connecting line from the factory to the proposed new railway line between Purjanpur to Palaspanga Plant site for a length of 6.5 km. under the consultant RITES Ltd., Bhubaneswar. RITES Ltd., Bhubaneswar. Completed
2 Preparation of Cross section and longitudinal section for the proposed 3rd line between Barang and Khurda Road Rly. Station of Khurda Road Division of East Coast Railway under the consultant RITES Ltd., Bhubaneswar. RITES Ltd., Bhubaneswar. 12/P/EcoR/ Barang-Khurda /Drg/2005/5326, Dt:19/04/2005 completed
3 Survey for the work at Meramandali between Budhapank in connection with Railway siding for M/s BRG Iron & Steel Co. Pvt. Ltd. Aarvee Associate,Ravula Residency,Srinagar Colony,Hyderabad-82, India. completed

Experience in Topographical & Detail Survey work of different Area/Land

Sl. No. Project Client Status
1 DGPS Survey of forest land pertaining to Seremda-Bhadrasahi Iron & Manganese Ore Mines of OMC Ltd. over 1086.765 ha proposed for diversion under Forest Conservation Act, 1980 and preparation/verification of Geo-referenced map by ORSAC. Odisha Mining Corporation Limited, Post Box No. : 34, Bhubaneswar-751001 On going
2 DGPS Survey of forest land pertaining to Dalki Iron & Manganese Ore Mines of OMC Ltd. over 245.524 ha proposed for diversion under Forest Conservation Act, 1980 and preparation/verification of Geo-referenced map by ORSAC. Odisha Mining Corporation Limited, Post Box No. : 34, Bhubaneswar-751001 On going
3 DGPS Survey at DLQ Mines ACC Limited, Bargarh Cement Works, Cement Nagar, Bardol, Bargarh. on going
Sl. No. Project Client Status
4 Conducting Total station survey of Mahisapat Industrial Estate at Dhenkanal. Orissa Industrial Infrastructure Development Corporation,IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed
5 Conducting Total station survey of Balukhunda Industrial Estate at Puri. Orissa Industrial Infrastructure Development Corporation, IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed
6 Conducting Total station survey of Gundichapada Industrial Estate at Dhenkanal. Orissa Industrial Infrastructure Development Corporation, IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed
7 Conducting Total station survey of Sikharachandi, Chandaka I.A, Bhubaneswar Orissa Industrial Infrastructure Development Corporation,IDCO, IDCO Towers, Janpath, Bhubaneswar. HO/P&C/EST/E-989/2013/13861 Dt: 05.07.2013 Completed
Sl. No. Project Client Status
8 Conducting Total station survey of Kadam-E-Rashool, Darghabazar, Cuttack. Orissa Industrial Infrastructure Development Corporation,IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed
9 Conducting Total station survey of Growth Centre, Jharsuguda Orissa Industrial Infrastructure Development Corporation, IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed
10 Conducting Total station survey of layout of Boundary line and fixing of pillars for STA Samuka Beach project at Sipasarubali, Puri Orissa Industrial Infrastructure Development Corporation, IDCO, IDCO Towers, Janpath, Bhubaneswar. Completed

Experience in Sewerage Projects

Sl. No. Project Client Status
1 Topographical Survey of UGD work of 25 Km at Puri, Odisha, Under OWSSB, Govt. of Odisha. Ramky Infrastructure Ltd. Ramky House, Rajvavan Road, Samaji Guda, Hyderabad Completed
2 Survey & Preparation of L.S. Drawing for our OWSSB job in Puri (35 Km) Suvadra Estates & Constructions, MB-37 Badagada, BRIT Colony, Bhubaneswar. completed

Experience in HT Transmission Power

Sl. No. Project Client Status
1 Topographic Survey for Route Alingment of 400Kv Transmission Power Line at 3x350 MW KVK Nilachal Power Private Limited at Kandarai Village, Cuttack District, Orissa, India KVK Nilachal Power Private Limited, #6-3-1109/A/1, 3rd Floor, Navabharat Chambers, Rajbhavan Road, Somajigguda, Hyderabad-500082, India. Completed
2 Priliminary Topographic/Detailed survey and preparation of land acquisition report for our route alignment of 132KV Transmission Power line from M/s Arya Sub-station, Bolani to Benificiation Plant at Tanto, Barbil of M/s Brahmani River Pellets Limited Brahmani River Pellets Limited. (BRPL), 5th Floor, IPICOL Annexe Building, IPICOL House, Janpath, BhubaneswarOdisha-751022 completed

Experience in Mines Area Survey work

Sl. No. Project Client Status
1 DGPS survey and Calculate the area of Kurmitar Iron Ore Mines (133Ha.) C/o OMC Ltd. Sundargarh, Odisha. Kalinga Commercial Corporation Limited, C-112, HIG, Baramunda H.B. Colony, Bhubaneswar. Completed
2 Bathymetric and Topographical Survey of Mines void Quarry No. IV in Jagannath colliery of Mahanadi Coalfields Limited (MCL) for Bhushan Steel Limited. Bhushan Steel Limited, F-Block, 1st Floor, International Trade Tower, Nehru Place, New Delhi. completed
3 Topographical survey & taking the initial spot levels and preparation of Contour of D-Quarry for South Kaliapani Chromite Mines, C/o OMC Ltd., Jajpur,Odisha. Dhansar Engineering Co. Pvt. Ltd. Dhansar, Dhanbad, Jharkhand. completed
4 Topographic survey of proposed ETP, Ore plot, COBP, Quarry area, OB-Dump etc of South Kaliapani mines. Odisha Mining Corporation Limited (OMC), J.K. Road Civil Division, Kaliapani, Jajpur. completed

Experience in Bathymetric & Hydrographic Detail Survey work

Sl. No. Project Client Status
1 Quotation for Topographic survey of proposed ETP, Ore plot, COBP, Quarry area, OB-Dump etc of South Kaliapani mines. The Manager (Civil),South Kaliapani mines, Odisha Mining Corporation Ltd., Jajpur, Odisha. Completed
2 Hydrographic Survey on River Mahanadi near Deogaon, Sambalpur, Orissa for Sindol- IH.E. Project. WAPCOS LTD, Bhubaneswar. completed

Experience in Supply of Survey Equipments (ETS) and Survey Manpower for Different Projects

Sl. No. Project Client Status
1 Supply of Survey Equipments (ETS) and Survey Manpower on Monthly basis at Tanto, Barbil Brahmani River Pellets Limited. (BRPL), 5th Floor, IPICOL Annexe Building, IPICOL House, Janpath, Bhubaneswar Completed
2 Supply of Survey Equipments (ETS) and Survey Manpower on Monthly basis at Tanto, Barbil. Brahmani River Pellets Limited. (BRPL),5th Floor, IPICOL Annexe Building, IPICOL House, Janpath, Bhubaneswar, Odisha-751022. completed
3 Supply of Survey Equipments (ETS) and Survey Manpower on daily basis for conducting the survey work of proposed construction site at Bhushan Steel Limited, Angul. Jaihind,3rd floor, Venus Atlants Corporate Park, Ahmedabad, Gujrat, India. completed